2013/07/19

Microhydro on Irrigation Channel in Shimada, Shizuoka


A microhydro power station of 893kW was completed in Shimada city of Shizuoka prefecture.

The station named "Ita power plant" was installed on an irrigation channel, where the water elevation is 7 meters.

And the water flow is 17 cubic meters per second.

SmartJapan 2013/07/17 07:00
http://www.itmedia.co.jp/smartjapan/articles/1307/17/news011.html

No comments:

Post a Comment