2013/06/12

2.6MW Solar Completed in Yorii, Saitama


The gas distributor Saisan in Saitama city completed on 11th the construction of 2.6MW solar facility in Yorii town, Saitama prefecture.

The station has 16,384 panels on a land of 5.3 hectares. It will start operation from July.

Asahi: Saitama Area: 2013/06/12
http://www.asahi.com/area/saitama/articles/TKY201306110555.html
Saisan Press Release (in Japanese)
http://www.saisan.net/saisan/info/index08.html

No comments:

Post a Comment