2013/04/27

2 MW In-Factory Solar Project in Udo, Kumamoto



Udo city of Kumamoto prefecture announced on 22nd that Kyuden Ecosol, a group company of Kyushu Electric Power, was going to install a solar power stations of 2 MW in a factory owned by Nippon Synthetic Chemical Industry.

The project is a joint enterprise by the two companies as well as Udo city and Kumamoto prefecture.

It aims to commercial operation from November this year.

Udo city: Press Release (in Japanese) 2013/04/22
http://www.pref.kumamoto.jp/uploaded/life/1070792_1163484_misc.pdf

No comments:

Post a Comment